Frameworks and controls
Adopting frameworks, the control library, assessments and certification readiness.
- Read the Control LibraryWhat the Control Library shows: every control in scope, what you declared, what the evidence says, and which ones need you first.
- Update a controlSet a control's declared status, owner, review date and implementation notes, and see what the evidence says next to your claim.
- Mark a control not applicableRecord that a control does not apply to your organisation, with the justification an auditor will read.
- Read the Frameworks pageWhich frameworks are in scope, how much of each is declared and proven, what one control set covers across frameworks, and what you could adopt next.
- Adopt or remove a frameworkBring a framework into scope so its controls join your register, or take it out again without losing what you declared.
- Map a control to another frameworkLink a control to the equivalent requirements of another framework so that work done once counts for both.
- Import a crosswalk between two frameworksWrite the platform's control mappings between two frameworks in scope in one step, so proof for one counts for the other.
- Run an assessmentStart an assessment on a framework in scope, answer its questions with the evidence beside each, and attach notes, links or files to an answer.
- Complete an assessmentScore and lock an assessment, and write its answers into the Control Library.
- Generate an assessment reportTurn a completed assessment into a written report in English, Dutch or French, read it in the app and download it as a PDF.
- Track certification readinessStart a readiness track for ISO/IEC 27001 or SOC 2 Type II, see what would stop you today, and keep the audit details and stage up to date.