ValystrumHelp
Sign in

Attest a control by hand

Plans
Gold, Enterprise
Where
Evidence & Monitoring, Control Library
Updated
Checked on
v0.41.2

Some controls can only be checked by a person: a restore test, a door lock, an access review. An attestation records that check, with your name, the date and a note, as evidence for the control.

You need a collector whose source is a person attests, bound to the control. If there is none, add one first (see Add an evidence collector).

Attest

  1. Open the collector from Evidence & Monitoring.
  2. Select Attest pass, Attest partial or Attest fail.
  3. In Attestation note, write what you checked, for example "Restored yesterday's database backup to the staging cluster; 4 tables compared, all equal." The note is kept as the evidence.
  4. Select Yes, pass (or Yes, partial, Yes, fail). The button stays disabled until you write a note. Select Cancel to leave without recording anything.

The page confirms "Attested pass: written down as evidence." The collector's Last result and Last run update, and Runs counts the attestation.

What the control shows

  • With a pass and no other failing collector on the control, the control reads proven by your collector. It counts as proven in the Control Library, on the Frameworks page (as proof "with your documents"), in the Posture Score and in obligation readiness.
  • With a fail, the control reads failing on your collector.
  • When another collector on the same control fails, the control stays failing whatever you attest, and the collector's headline says so.

Keep it fresh

An attestation is stale once its cadence has passed: after 2 days for a daily one, 14 days for a weekly one. A stale attestation no longer proves the control, and the collector shows up under Gone dark. The Attestations figure on Evidence & Monitoring counts the ones overdue.

On a person's word shows how much of your current proof rests on attestations rather than on automated checks. Auditors look at that balance.